Watermain Replacement & Road Resurfacing of Britannia Rd West from Winston Churchill Blvd to Erin Mills Pkwy

Watermain Replacement & Road Resurfacing of Britannia Rd West from Winston Churchill Blvd to Erin Mills Pkwy:   The Region of Peel is replacing watermains and resurfacing Britannia Road West from Winston Churchill Boulevard to Erin Mills Parkway.  The work started at the end of March 2017 and is anticipated to be completed by November 2017. This work will also include removing and replacing curbs, adding sidewalks and a multi-use trail, and installing a low impact development (environmentally friendly) storm sewer system. Click here for more information.  As we near the end of our watermain construction on Britannia Road there will need to be a connection at the intersection of Britannia Road and Erin Mills Parkway.  This will require us to close some lanes at the intersection similar to what was previously and recently done.  Update as at August 16, 2017:  Once again, we are at the stage where we need to work near the intersection of Erin Mills Parkway to complete some storm sewer related works.  That said, there is a need to do day lane closures on Thursday, August 17 from 9:00 am to 6:00 pm as follows:

  • One of the northbound left turn lanes will be closed and southbound traffic will be reduced to two lanes through the intersection.
  • Westbound traffic will be redirected into a single eastbound lane.

This is a similar setup to what has been occurring through the different stages of this project.  No turning movements will be restricted and police officers will be on site during the construction to assist with traffic flow. If appropriate, traffic signal timing may be modified so that traffic disruptions are minimized.   Thank you for your patience during these works.